Environment and permits
We support environmental assessment and permitting for energy, construction and infrastructure projects, coordinating the specialists involved.
Request a screening of your site
Scope
- Environmental studies
- Support with SEIA environmental assessment
- Monitoring of RCA commitments
- Sector permits
- Regulatory compliance
- Environmental technical advice
- Environmental monitoring
- Environmental and social due diligence
What we do
From siting to closure
Almost every project that works on a site has environmental obligations, and they don't end with the approval: they continue on site, throughout operation and until closure.
- Siting
- Screening
- Assessment
- RCA and permits
- Construction
- Operation
- Changes and closure
Early assessment
Before committing design and schedule: what the site restricts and which assessment route applies.
- Territorial and environmental constraints: protected areas, watercourses, vegetation, heritage and land use
- Analysis of whether the project must enter the SEIA (Chile's environmental impact assessment system)
- Assessment route: Environmental Impact Statement (DIA) or Study (EIA)
- Sectoral environmental permits (PAS) and other applicable permits
- Environmental criteria built into the layout and the engineering
Studies and SEIA processing
We coordinate the specialists and make sure what is assessed matches what will be built.
- Scope and calendar of baselines: some need campaigns in different seasons
- Coordination of specialists: flora and fauna, archaeology, noise, soils, hydrology, landscape and human environment
- Support in preparing the DIA or EIA
- Consistency between the project description and its engineering
- Responses to ICSARA requests and addenda, and follow-up before the SEA
Sectoral permits
Depending on the project and its site, for example:
- Favourable report for building in rural areas (art. 55 of the General Urban Planning Law) and change of land use
- Forest management plans before CONAF
- Works in watercourses before the General Water Directorate (DGA)
- Municipal building permits and final approval
- Access and right-of-way before the Road Directorate (Vialidad)
- National Monuments Council and electrical declarations before the SEC
- Processing under the Framework Law on Sectoral Authorisations (Ley 21.770)
Compliance during construction
What the Environmental Qualification Resolution (RCA) commits to is carried out on site, with evidence from the first day of works.
- Notice of start of execution before the Superintendency of the Environment (SMA)
- Commitments carried into engineering, contracts, construction plans and subcontractors
- Environmental site inspection
- Coordination of monitoring: noise, particulate matter, water, archaeology and fauna rescue
- Follow-up reports to the SMA in the form and frequency the RCA sets
Follow-up during operation
Many commitments stay in force for the whole life of the project: we keep them with an owner, a date and evidence.
- RCA commitment matrix with reminders and evidence
- Periodic monitoring and reports to the SMA
- Preparation for inspections
- Alerts on new SEIA projects near the site and on enforcement news
Changes, financing and closure
Every project change and every financing reviews what was approved again, until closure.
- Screening of modifications, repowering or added storage before the SEA
- Environmental and social due diligence for lenders (IFC Performance Standards, Equator Principles)
- Environmental review in asset purchases and sales
- Closure and abandonment phase committed in the RCA
What you get
Concrete deliverables, from the first stage
Constraints report
What the site imposes on the project, with its location and the source of every data point.
Local precedents
Similar projects assessed in the SEIA near the site: how they were assessed and what was raised.
Permit roadmap
Which permits apply, before whom, in what order and what each one requires.
Commitment matrix
The RCA's commitments with owner, deadline and evidence, with automatic reminders and visible to the client in their portal.
Data and automation
Faster environmental information, with a specialist's judgement
Much of an environmental assessment is gathering and reading scattered information: territorial layers, assessed projects, resolutions, inspections. We automate cross-checking official data against the project's location and organize it with rules set by our specialists, so the team can spend its time analyzing and deciding.
Technology speeds up searching and reading; the analysis, the conclusions and the responsibility always belong to specialists.
01Public sources
Public SEIA data, SMA inspections and official territorial layers.
02Automation
Cross-checks official data against the project's location and keeps it organized.
03Analysis rules
Identifies commitments in the RCA and compares similar projects to anticipate observations.
04Specialists
Review, validate and conclude. Every deliverable carries their review.
Public sources such as
- SEIA: assessed projects (official downloads)
- SNIFA (SMA): inspections and sanctions
- IDE Chile: territorial layers
- Protected areas and priority sites
- Native forest survey (CONAF)
- Watercourses and water rights (DGA)
- National monuments (CMN)
Our own tools
What the team uses on every project
Site screening
The project's location checked against official layers: protected areas, priority sites, wetlands, vegetation, watercourses and contaminated sites, with the distance to each.
SEIA precedents
How similar projects were assessed: timelines, rounds of observations, sectoral permits and the topics the authority raised most.
Pre-check
The DIA or EIA draft reviewed against the topics most often raised for similar projects, before it is submitted.
Site screening · example
640 ha plot east of La Serena, 10 km radius
- Protected areas
- None found
- Nearest priority site
- 6.6 km
- Inventoried wetland (Elqui river)
- 1.0 km
- SEIA projects within the radius
- 60
- Typical assessment time, energy projects (Chile)
- 193 days
Head of the area
Mauricio Cifuentes Navarro
Environment, Innovation & Technology Manager
A marine biologist with experience in sampling automation, he leads a team with long experience in environmental studies in Chile. Every site screening, pre-submission review and commitment matrix goes through his review before it reaches the client.
LinkedInFor projects in
Permits from the design stage
Constraints identified early · Studies with a defined scope · Engineering consistent with what was assessed · Commitments traceable to the site
FAQ
Frequently asked questions about environmental permits
What is a «pertinencia» (screening) for the SEIA?
It is a request to the Environmental Assessment Service (SEA) to rule on whether a project, or a change to an existing one, must enter the Environmental Impact Assessment System. It is not mandatory, but it gives certainty when a project is close to a threshold or when something already approved changes. We prepare it with the project description and the supporting information.
What is the difference between a DIA and an EIA?
An Environmental Impact Declaration (DIA) applies when the project does not cause the effects listed in article 11 of Law 19.300, such as health risks, significant adverse effects on natural resources, resettlement of communities or alteration of heritage. An Environmental Impact Study (EIA) applies when it does: it requires fuller baselines, mitigation, repair and compensation measures, and formal public participation. The route is set during the early assessment, based on the project and its site.
How long does an environmental assessment take?
The legal terms are 60 working days for a DIA and 120 for an EIA, and both can be extended. They stop while the developer answers the authority's observations (ICSARA and addenda), so the actual duration is usually much longer. Before that come the baselines, and some need surveys in different seasons. That is why it pays to start early and submit a file consistent with the engineering.
What obligations remain after the RCA is granted?
The Environmental Qualification Resolution (RCA) sets conditions and commitments for construction, operation and closure: measures on site, monitoring, and follow-up reports to the Superintendency of the Environment (SMA), which enforces them and can sanction non-compliance. Most projects also need sectoral permits before building.
What is the notice of start of execution to the SMA?
It is how the developer informs the Superintendency of the Environment that it has started executing the approved project, under its 2025 instructions. It matters because the RCA expires if execution does not start within five years of its notification, and the notice is the formal record of that start.
What does Law 21.770 on sectoral authorisations change?
The 2025 Framework Law on Sectoral Authorisations aims to streamline sectoral permits: it sets common processing rules, creates a unified digital system and, for lower-risk activities, replaces some permits with notices or declarations. It applies gradually and depends on regulations, so for each project we check which regime applies to each permit.
Can you help if the project is already approved or operating?
Yes. We organise the RCA's commitments in a matrix with owner, deadline and evidence, coordinate monitoring and SMA reports, prepare for inspections and assess screenings for changes, repowering or added storage. We also carry out environmental and social due diligence for lenders or buyers.
Tell us about your projectHow much does the environmental service cost?
It depends on the project, the site and the stage: a screening is not the same as an EIA with baselines over several seasons. So we start by narrowing the scope (what constrains the site, which assessment route applies and which studies are needed) and then send you a proposal detailing each stage. The online site check is free.
Check my site for freeWhat happens if the SEA asks for more information?
That is the norm. During the assessment, the authority issues an ICSARA (consolidated request for clarifications, corrections or extensions) and the developer answers with an addendum. We coordinate the answers with the specialists and the engineering, and before submitting the file we review it against the issues most often raised on similar projects, to reduce those rounds. Whether observations come is up to the authority.
Can we start with something limited?
Yes. Many projects start with an early site assessment: a constraints report and the permit route that applies, before committing to the design or buying the land. From there you decide whether a screening, a DIA, an EIA or only sectoral permits apply.
What do you need to get started?
The site location (coordinates, a KMZ or the property's tax roll number), a project description (what will be built, how big and on what timeline) and its current stage. An existing RCA or screening also helps.
Do you work outside the Coquimbo Region?
Yes. We are based in La Serena and work throughout Chile: site screenings and precedents use official data for any region, and we coordinate specialists and field surveys wherever the project is.
Do you have a site or a project under assessment?
In a free 30-minute first conversation, we review what the site requires, which assessment route applies and which commitments come after the approval. You keep that guidance whether or not you work with us.