PMGD

PMGD · Distributed generation

Development, engineering and execution of distributed generation projects

Aerial view of a completed solar PV plant in an agricultural valley

PMGD | DISTRIBUTED GENERATION

SUN & WIND takes part in the technical development and execution of PMGD projects (small distributed generation, up to 9 MW), integrating multidisciplinary engineering, constructability review, civil and electrical infrastructure, supply management, construction, interconnection, testing and commissioning.

Our approach starts from the actual conditions of the site and the point of interconnection, aiming to optimize CAPEX, energy yield, losses, availability, construction schedule and the asset’s operational performance.

DEVELOPMENT AND TECHNICAL FEASIBILITY

  • Preliminary site assessment
  • Analysis of land-use and construction constraints
  • Assessment of access and construction logistics
  • Survey of existing conditions
  • Topographic analysis and geotechnical constraints
  • Preliminary solar resource assessment
  • Capacity definition and conceptual configuration
  • Preliminary point-of-interconnection analysis
  • Identification of required electrical infrastructure
  • Preliminary energy yield and loss estimate
  • CAPEX/OPEX estimate
  • Assessment of technical and construction risks
  • Technical Due Diligence of projects under development

PV ENGINEERING

  • Conceptual, basic and detailed engineering
  • Basis of Design and engineering criteria
  • Layout optimization
  • DC and AC capacity definition
  • Technical selection of PV modules
  • String vs. central inverter assessment
  • String configuration
  • DC network design
  • AC and medium-voltage network design
  • Single-line diagrams
  • Cable sizing
  • Protection coordination
  • Grounding systems
  • Auxiliary services
  • SCADA, communications and monitoring
  • IFC engineering and As-Built documentation

CIVIL ENGINEERING AND BALANCE OF PLANT

  • Surveying and staking out
  • Earthworks and cut/fill balance
  • Pad preparation and grading
  • Design and construction of internal roads
  • Permanent and temporary access
  • Drainage and stormwater management systems
  • Crossings and special structures
  • Foundations for electrical equipment
  • Pads for inverters and transformers
  • Electrical raceways and trenches
  • Pull boxes and utility crossings
  • Perimeter fencing and gates
  • Ancillary works and site restoration

GENERATION SYSTEM

  • Installation of fixed structures or trackers as designed
  • PV module installation
  • DC cabling and termination
  • Installation of combiner boxes and associated equipment
  • Inverter installation and mounting
  • Transformer stations
  • Medium-voltage collector networks
  • Auxiliary system integration
  • Monitoring and communication systems
  • Torque control and terminations
  • Installation inspection and testing

INTERCONNECTION INFRASTRUCTURE

  • Engineering of medium-voltage installations
  • Internal collection networks
  • Overhead and underground raceways
  • Transformation and switching
  • Medium-voltage switchgear
  • Protection and metering systems
  • Grounding
  • Integration with interconnection infrastructure
  • Technical interface coordination
  • Preparation of technical documentation required for interconnection
  • Technical support during energization and commissioning

PROCUREMENT & SUPPLY CHAIN

  • Preparation of technical specifications
  • Technical Bid Evaluation
  • Technical approval of equipment and suppliers
  • Review of datasheets and manufacturer documentation
  • Interface control between supply packages
  • Manufacturing and deliverables follow-up
  • Expediting of critical equipment
  • Long Lead Items tracking
  • Inspection and receipt of supplies
  • On-site materials management
  • Traceability and technical documentation control

CONSTRUCTION | BOS

  • Mobilization and temporary facilities
  • Site Preparation
  • Civil works and earthworks
  • Roads and drainage
  • Foundations and pads
  • Mechanical installation
  • PV installation
  • DC networks
  • AC and MV networks
  • Electrical grid connection infrastructure
  • Grounding
  • SCADA and communications
  • Subcontract management
  • Multidisciplinary construction coordination
  • Production and productivity control

QA/QC & HSE

  • Project Quality Plan
  • Inspection & Test Plans
  • Material Receiving Inspection
  • Construction protocol control
  • Civil, mechanical and electrical inspections
  • NCR management and corrective actions
  • Document control and traceability
  • Quality dossiers
  • On-site HSE management
  • Control of critical activities
  • Safety and quality KPI tracking

TESTING & COMMISSIONING

  • Mechanical Completion
  • Pre-energization inspections
  • Continuity and insulation testing
  • Polarity verification
  • Grounding tests
  • MV equipment testing
  • Protection verification
  • Inverter functional testing
  • Communications and SCADA verification
  • Progressive energization
  • Commissioning
  • Performance Verification
  • Punch List and close-out of open items
  • Handover and delivery of final dossiers

ENGAGEMENT MODEL

  1. DEVELOPMENT SUPPORT
  2. ENGINEERING
  3. PROCUREMENT
  4. BOS CONSTRUCTION
  5. GRID CONNECTION
  6. COMMISSIONING
  7. HANDOVER

EXECUTION OBJECTIVES

  • CAPEX
  • SCHEDULE
  • CONSTRUCTABILITY
  • ENERGY YIELD
  • LOSSES
  • QUALITY
  • SAFETY
  • AVAILABILITY

WHAT IS A PMGD?

Small distributed generation: what defines it and what shapes its development

A PMGD (Pequeño Medio de Generación Distribuida, or small distributed generation project) is a power generation project whose surplus capacity does not exceed 9 MW and that connects to a distribution company’s facilities, that is, the medium-voltage grid serving cities, towns and rural areas, rather than directly to the transmission system.

The category depends not on the technology but on size and point of interconnection. In Chile, solar PV is the most common, increasingly paired with battery energy storage (BESS).

CAPACITY

Surplus capacity of up to 9 MW injected into the grid.

POINT OF INTERCONNECTION

A distribution company’s medium-voltage grid. Available capacity on each feeder is limited and set by the distribution company.

REGULATORY FRAMEWORK

Chile’s General Electricity Services Law and the regulation for small-scale generation (Supreme Decree 88 of 2019). Supreme Decree 1 of 2026 added energy storage and updated the pricing regime.

ENERGY SALES

Current regulations define how injected energy is valued, which directly affects the project’s financial evaluation and financing.

These conditions are assessed from the earliest stage: SUN & WIND reviews the site, the point of interconnection and the plant configuration before committing to detailed engineering and construction.

Environment and permits

The environmental side of your project

Almost every project that works on a site needs environmental studies, permits or monitoring at some stage. We coordinate them alongside the engineering and the works, so what is assessed matches what is built.

See environment and permits
  • A favourable RCA before the construction declaration if the project enters the SEIA; otherwise, an optional screening to document it
  • Favourable report for building in rural areas and change of land use
  • Flora, fauna and archaeology baselines for the site

Let’s talk about your next project

Are you evaluating an investment, developing engineering or looking for a partner to carry out civil, electrical or energy works? SUN & WIND can help you shape a technical and commercial solution suited to your project’s objectives.